steps to effective time management

The steps to effective construction time management are shown in the list below. Over time, this tutorial will include all of these steps.

  • Examine the Contract
  • List Major Contractual Obligations
  • Divide Project into Major Work Areas
  • Building Technology Implies Sequence
  • Find Productivity, Duration, Cost
  • Calculate Initial Schedule
  • Schedule Adjustments
  • Resource Evaluation
  • Time / Cost Trade-off
  • Total Project Cash Flow
  • Include All Important Procurement

Over time this tutorial will cover each of these steps. As of 2008 this tutorial will include instruction on creating and calculating the initial schedule. Later additions to this tutorial will include resource unlimited resource leveling and limited resource allocation, time-cost tradeoff, and cash flow analysis.